The plan
Strategy
How we get from road classification to execution, and how money is raised and spent along the way.
Progress, road by road
Where we stand, road by road
Each road-property donated to the commune goes through the same five stages, from donation to the final registration as a road. Here is where each one stands now.
| Property | Donated | Public domainHCL 66 | Classified as roadHCL 53 | OCPI category„drum” | Inventory |
|---|---|---|---|---|---|
| 101549drumul principal · 52.920 mpîn curs — categorie ocpi | done | done | done | in progress | upcoming |
- done
- in progress
- upcoming
What each stage means
- Donated
- proprietarul (familia Dăneț) a donat terenul-drum comunei.
- Public domain
- comuna a preluat efectiv proprietatea (HCL 66) și a întabulat-o la OCPI.
- Classified as road
- consiliul l-a declarat drum de interes local — drum comunal (HCL 53).
- OCPI category
- în cadastru, categoria se schimbă din „curți construcții" în „drum".
- Inventory
- drumul intră în inventarul actualizat al domeniului public al comunei.
The Grid–crossroads access road does not yet have a road land-title (see The road). Two properties with road geometry — CF 104307 and CF 104490 — are privately owned, not donated.
The table tracks the legal registration of each property. The steps after registration — the study, the design, the works — are on The road. Looking for a specific plot? Search the Land registry. Members find the per-property analysis and documentation costs in Members.
Money
Financial strategy
Nothing added yet.